All Crane

All Crane required a three story building with a 100 ton crane inside.  The site was a very poor soft soil down to bedrock, 60 feet.  Deep pile foundations were required.  McCloy Construction used CHANCE Helical piers.  Over 100 piers were installed at a capacity of 162 kips.  As the grade beams were being excavated, the Helical piers were being installed and at the end of each day all deep pile foundations had been installed everywhere the ground was excavated.  Speeding up overall construction time with no spoil removal.